{"id":62019,"date":"2026-11-18T20:00:49","date_gmt":"2026-11-18T17:00:49","guid":{"rendered":"https:\/\/thesauditimes.net\/en\/?p=62019"},"modified":"2026-11-18T20:00:49","modified_gmt":"2026-11-18T17:00:49","slug":"saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens","status":"publish","type":"post","link":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/","title":{"rendered":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens"},"content":{"rendered":"<p>The Saudi renewable energy pipeline has reached about 79 gigawatts, Energy Minister Prince Abdulaziz bin Salman said at the United Nations climate conference COP31 in Antalya, T\u00fcrkiye. The figure refers to projects under development in the Kingdom, not to plants that are already feeding the grid.<\/p>\n<p>In the same address the minister said the Kingdom aims to raise its carbon capture and storage capacity to 44 million tons a year over the next decade, and he renewed its commitment to the UN climate convention and the Paris Agreement.<\/p>\n<p>The pipeline is still growing. The Saudi Power Procurement Company, the Principal Buyer of electricity in the Kingdom, has opened qualification for developers in the eighth round of the National Renewable Energy Program, which is overseen by the Ministry of Energy. The round covers three projects with a combined capacity of 3,200 megawatts: the 900 megawatt Tumair solar plant in the Riyadh region, the 1,000 megawatt East Al-Amoah solar plant in Asir, and the 1,300 megawatt Al-Mozeraah wind farm in the Makkah region. Qualification is the first stage of the tender, before bids are invited and power purchase agreements are signed with the winning groups.<\/p>\n<p>The program aims to cut the use of liquid fuels in power generation and to bring renewables to about 50 percent of the electricity mix by 2030. A project tracker kept by the King Abdullah Petroleum Studies and Research Center counted about 70 gigawatts across 58 projects in September 2026, of which 17 were operating, 24 were under development and 17 had been offered for bidding, Asharq Al-Awsat reported.<\/p>\n<p>Storage is being added alongside. The Kingdom has tendered about 30 gigawatt hours of battery storage, of which 8 gigawatt hours are connected to the grid. Seven solar and wind projects totalling 15 gigawatts, contracted in July 2025, are due to enter service in phases during the second half of 2027 and the first half of 2028.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Saudi renewable energy pipeline has reached about 79 gigawatts, Energy Minister Prince Abdulaziz bin Salman said at the United Nations climate conference COP31 in Antalya, T\u00fcrkiye. The figure refers to projects under development in the Kingdom, not to plants that are already feeding the grid. In the same address the minister said the Kingdom aims to raise its carbon capture and storage capacity to 44 million tons a year over the next decade, and he renewed its commitment to the UN climate convention and the Paris Agreement. The pipeline is still growing. The Saudi Power Procurement Company, the Principal<\/p>\n","protected":false},"author":1,"featured_media":62020,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[260],"tags":[],"class_list":["post-62019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-finance-and-economics"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times<\/title>\n<meta name=\"description\" content=\"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times\" \/>\n<meta property=\"og:description\" content=\"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/\" \/>\n<meta property=\"og:site_name\" content=\"The Saudi Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/TheSaudiTime\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-18T17:00:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"The Saudi Times\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@thesauditimes_\" \/>\n<meta name=\"twitter:site\" content=\"@thesauditimes_\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"The Saudi Times\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/\"},\"author\":{\"name\":\"The Saudi Times\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/person\\\/ba8713cb31d87743608f3311cd180cd0\"},\"headline\":\"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens\",\"datePublished\":\"2026-11-18T17:00:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/\"},\"wordCount\":313,\"publisher\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png\",\"articleSection\":[\"Finance and economics\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/\",\"name\":\"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png\",\"datePublished\":\"2026-11-18T17:00:49+00:00\",\"description\":\"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#primaryimage\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png\",\"width\":1920,\"height\":1080,\"caption\":\"Prince Abdulaziz bin Salman, Minister of Energy, speaking at the International Atomic Energy Agency general conference in Vienna in September 2022. Photo: IAEA Imagebank via Wikimedia Commons, CC BY 2.0\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Finance and economics\",\"item\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/category\\\/finance-and-economics\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\",\"name\":\"The Saudi Times\",\"description\":\"Saudi Arabia News, Business and Culture\",\"publisher\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"},\"alternateName\":[\"\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632\",\"\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\"],\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\",\"sameAs\":[\"https:\\\/\\\/thesauditimes.net\\\/\"]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\",\"name\":\"The Saudi Times\",\"alternateName\":[\"\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632\",\"\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\"],\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/The-Saudi-Times.jpeg\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/The-Saudi-Times.jpeg\",\"width\":1280,\"height\":1280,\"caption\":\"The Saudi Times\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/TheSaudiTime\",\"https:\\\/\\\/x.com\\\/thesauditimes_\",\"https:\\\/\\\/www.instagram.com\\\/thesauditime\\\/\",\"https:\\\/\\\/thesauditimes.net\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/person\\\/ba8713cb31d87743608f3311cd180cd0\",\"name\":\"The Saudi Times\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"caption\":\"The Saudi Times\"},\"sameAs\":[\"https:\\\/\\\/thesauditimes.net\\\/en\"],\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/author\\\/ttaaamm84\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times","description":"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/","og_locale":"en_US","og_type":"article","og_title":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times","og_description":"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.","og_url":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/","og_site_name":"The Saudi Times","article_publisher":"https:\/\/www.facebook.com\/TheSaudiTime","article_published_time":"2026-11-18T17:00:49+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","type":"image\/png"}],"author":"The Saudi Times","twitter_card":"summary_large_image","twitter_creator":"@thesauditimes_","twitter_site":"@thesauditimes_","twitter_misc":{"Written by":"The Saudi Times","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#article","isPartOf":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/"},"author":{"name":"The Saudi Times","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/person\/ba8713cb31d87743608f3311cd180cd0"},"headline":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens","datePublished":"2026-11-18T17:00:49+00:00","mainEntityOfPage":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/"},"wordCount":313,"publisher":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#primaryimage"},"thumbnailUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","articleSection":["Finance and economics"],"inLanguage":"en-US","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/","url":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/","name":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens | The Saudi Times","isPartOf":{"@id":"https:\/\/thesauditimes.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#primaryimage"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#primaryimage"},"thumbnailUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","datePublished":"2026-11-18T17:00:49+00:00","description":"The Saudi renewable energy pipeline has reached about 79 GW, the energy minister said at COP31, as a 3.2 GW eighth round of solar and wind tenders opens.","breadcrumb":{"@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#primaryimage","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","width":1920,"height":1080,"caption":"Prince Abdulaziz bin Salman, Minister of Energy, speaking at the International Atomic Energy Agency general conference in Vienna in September 2022. Photo: IAEA Imagebank via Wikimedia Commons, CC BY 2.0"},{"@type":"BreadcrumbList","@id":"https:\/\/thesauditimes.net\/en\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thesauditimes.net\/en\/"},{"@type":"ListItem","position":2,"name":"Finance and economics","item":"https:\/\/thesauditimes.net\/en\/category\/finance-and-economics\/"},{"@type":"ListItem","position":3,"name":"Saudi renewable energy pipeline reaches about 79 GW as eighth tender round opens"}]},{"@type":"WebSite","@id":"https:\/\/thesauditimes.net\/en\/#website","url":"https:\/\/thesauditimes.net\/en\/","name":"The Saudi Times","description":"Saudi Arabia News, Business and Culture","publisher":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"},"alternateName":["\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632","\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629"],"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thesauditimes.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US","sameAs":["https:\/\/thesauditimes.net\/"]},{"@type":"Organization","@id":"https:\/\/thesauditimes.net\/en\/#organization","name":"The Saudi Times","alternateName":["\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632","\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629"],"url":"https:\/\/thesauditimes.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2024\/05\/The-Saudi-Times.jpeg","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2024\/05\/The-Saudi-Times.jpeg","width":1280,"height":1280,"caption":"The Saudi Times"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/TheSaudiTime","https:\/\/x.com\/thesauditimes_","https:\/\/www.instagram.com\/thesauditime\/","https:\/\/thesauditimes.net\/"]},{"@type":"Person","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/person\/ba8713cb31d87743608f3311cd180cd0","name":"The Saudi Times","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","caption":"The Saudi Times"},"sameAs":["https:\/\/thesauditimes.net\/en"],"url":"https:\/\/thesauditimes.net\/en\/author\/ttaaamm84\/"}]}},"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pgnDiS-g8j","jetpack_featured_media_url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2026\/11\/saudi-renewable-energy-pipeline-reaches-about-79-gw-as-eighth-tender-round-opens.png","_links":{"self":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/62019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/comments?post=62019"}],"version-history":[{"count":1,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/62019\/revisions"}],"predecessor-version":[{"id":62034,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/62019\/revisions\/62034"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/media\/62020"}],"wp:attachment":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/media?parent=62019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/categories?post=62019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/tags?post=62019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}