{"id":48163,"date":"2025-08-21T16:39:07","date_gmt":"2025-08-21T13:39:07","guid":{"rendered":"https:\/\/thesauditimes.net\/en\/?p=48163"},"modified":"2026-10-02T03:33:58","modified_gmt":"2026-10-02T00:33:58","slug":"acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity","status":"publish","type":"post","link":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/","title":{"rendered":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity"},"content":{"rendered":"<p>In a landmark step toward sustainable energy transformation, Saudi-based ACWA Power has commenced the full commercial operation of three major solar plants across the Kingdom, with a combined capacity of 2.79 GW.<\/p>\n<p>The projects include the Al-Kahfah plant in Hail with 1,425 MW, the Al-Rass 2 plant in Qassim with 1,000 MW, and the Saad 2 plant in Riyadh, which recently entered its second phase of operations, adding 365.7 MW to bring its total to 1,125 MW.<\/p>\n<p>These achievements align with Saudi Arabia\u2019s National Renewable Energy Program, which targets generating 58.7 GW of renewable energy by 2030, including 40 GW from solar power, alongside major expansions in wind and concentrated solar power.<\/p>\n<p>ACWA Power holds a 50.1% stake in these projects in collaboration with strategic partners, and the company expects the milestone to positively impact its financial performance in the second half of this year.<\/p>\n<p>This accomplishment is more than an operational success, it marks a significant stride in the Kingdom\u2019s drive to diversify its energy mix, reduce reliance on fossil fuels, and accelerate the transition toward a cleaner, more sustainable future, strengthening Saudi Arabia\u2019s global position as a leader in renewable energy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a landmark step toward sustainable energy transformation, Saudi-based ACWA Power has commenced the full commercial operation of three major solar plants across the Kingdom, with a combined capacity of 2.79 GW. The projects include the Al-Kahfah plant in Hail with 1,425 MW, the Al-Rass 2 plant in Qassim with 1,000 MW, and the Saad 2 plant in Riyadh, which recently entered its second phase of operations, adding 365.7 MW to bring its total to 1,125 MW. These achievements align with Saudi Arabia\u2019s National Renewable Energy Program, which targets generating 58.7 GW of renewable energy by 2030, including 40 GW<\/p>\n","protected":false},"author":1,"featured_media":48164,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[12852],"tags":[],"class_list":["post-48163","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-finance"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times<\/title>\n<meta name=\"description\" content=\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times\" \/>\n<meta property=\"og:description\" content=\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable\" \/>\n<meta property=\"og:url\" content=\"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/\" \/>\n<meta property=\"og:site_name\" content=\"The Saudi Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/TheSaudiTime\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-21T13:39:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-02T00:33:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1340\" \/>\n\t<meta property=\"og:image:height\" content=\"838\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"The Saudi Times\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@thesauditimes_\" \/>\n<meta name=\"twitter:site\" content=\"@thesauditimes_\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"The Saudi Times\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"NewsArticle\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/\"},\"author\":{\"name\":\"The Saudi Times\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/person\\\/ba8713cb31d87743608f3311cd180cd0\"},\"headline\":\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity\",\"datePublished\":\"2025-08-21T13:39:07+00:00\",\"dateModified\":\"2026-10-02T00:33:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/\"},\"wordCount\":199,\"publisher\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg\",\"articleSection\":[\"Business &amp; Finance\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2025\",\"copyrightHolder\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/\",\"name\":\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg\",\"datePublished\":\"2025-08-21T13:39:07+00:00\",\"dateModified\":\"2026-10-02T00:33:58+00:00\",\"description\":\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#primaryimage\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg\",\"width\":1340,\"height\":838,\"caption\":\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Business &amp; Finance\",\"item\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/category\\\/business-finance\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\",\"name\":\"The Saudi Times\",\"description\":\"Saudi Arabia News, Business and Culture\",\"publisher\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\"},\"alternateName\":[\"\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632\",\"\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\"],\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\",\"sameAs\":[\"https:\\\/\\\/thesauditimes.net\\\/\"]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#organization\",\"name\":\"The Saudi Times\",\"alternateName\":[\"\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632\",\"\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\"],\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/The-Saudi-Times.jpeg\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/The-Saudi-Times.jpeg\",\"width\":1280,\"height\":1280,\"caption\":\"The Saudi Times\"},\"image\":{\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/TheSaudiTime\",\"https:\\\/\\\/x.com\\\/thesauditimes_\",\"https:\\\/\\\/www.instagram.com\\\/thesauditime\\\/\",\"https:\\\/\\\/thesauditimes.net\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/#\\\/schema\\\/person\\\/ba8713cb31d87743608f3311cd180cd0\",\"name\":\"The Saudi Times\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"contentUrl\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/s-bb-Copy-96x96.png\",\"caption\":\"The Saudi Times\"},\"sameAs\":[\"https:\\\/\\\/thesauditimes.net\\\/en\"],\"url\":\"https:\\\/\\\/thesauditimes.net\\\/en\\\/author\\\/ttaaamm84\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times","description":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/","og_locale":"en_US","og_type":"article","og_title":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times","og_description":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable","og_url":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/","og_site_name":"The Saudi Times","article_publisher":"https:\/\/www.facebook.com\/TheSaudiTime","article_published_time":"2025-08-21T13:39:07+00:00","article_modified_time":"2026-10-02T00:33:58+00:00","og_image":[{"width":1340,"height":838,"url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","type":"image\/jpeg"}],"author":"The Saudi Times","twitter_card":"summary_large_image","twitter_creator":"@thesauditimes_","twitter_site":"@thesauditimes_","twitter_misc":{"Written by":"The Saudi Times","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#article","isPartOf":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/"},"author":{"name":"The Saudi Times","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/person\/ba8713cb31d87743608f3311cd180cd0"},"headline":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity","datePublished":"2025-08-21T13:39:07+00:00","dateModified":"2026-10-02T00:33:58+00:00","mainEntityOfPage":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/"},"wordCount":199,"publisher":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#primaryimage"},"thumbnailUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","articleSection":["Business &amp; Finance"],"inLanguage":"en-US","copyrightYear":"2025","copyrightHolder":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"}},{"@type":"WebPage","@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/","url":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/","name":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity | The Saudi Times","isPartOf":{"@id":"https:\/\/thesauditimes.net\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#primaryimage"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#primaryimage"},"thumbnailUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","datePublished":"2025-08-21T13:39:07+00:00","dateModified":"2026-10-02T00:33:58+00:00","description":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity .. In a landmark step toward sustainable","breadcrumb":{"@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#primaryimage","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","width":1340,"height":838,"caption":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity"},{"@type":"BreadcrumbList","@id":"https:\/\/thesauditimes.net\/en\/acwa-power-commences-commercial-operation-of-three-major-solar-plants-with-2-79-gw-total-capacity\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/thesauditimes.net\/en\/"},{"@type":"ListItem","position":2,"name":"Business &amp; Finance","item":"https:\/\/thesauditimes.net\/en\/category\/business-finance\/"},{"@type":"ListItem","position":3,"name":"ACWA Power Commences Commercial Operation of Three Major Solar Plants with 2.79 GW Total Capacity"}]},{"@type":"WebSite","@id":"https:\/\/thesauditimes.net\/en\/#website","url":"https:\/\/thesauditimes.net\/en\/","name":"The Saudi Times","description":"Saudi Arabia News, Business and Culture","publisher":{"@id":"https:\/\/thesauditimes.net\/en\/#organization"},"alternateName":["\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632","\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629"],"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/thesauditimes.net\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US","sameAs":["https:\/\/thesauditimes.net\/"]},{"@type":"Organization","@id":"https:\/\/thesauditimes.net\/en\/#organization","name":"The Saudi Times","alternateName":["\u0633\u0639\u0648\u062f\u064a \u062a\u0627\u064a\u0645\u0632","\u0627\u0644\u062a\u0627\u064a\u0645\u0632 \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629"],"url":"https:\/\/thesauditimes.net\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/logo\/image\/","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2024\/05\/The-Saudi-Times.jpeg","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2024\/05\/The-Saudi-Times.jpeg","width":1280,"height":1280,"caption":"The Saudi Times"},"image":{"@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/TheSaudiTime","https:\/\/x.com\/thesauditimes_","https:\/\/www.instagram.com\/thesauditime\/","https:\/\/thesauditimes.net\/"]},{"@type":"Person","@id":"https:\/\/thesauditimes.net\/en\/#\/schema\/person\/ba8713cb31d87743608f3311cd180cd0","name":"The Saudi Times","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","contentUrl":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/09\/s-bb-Copy-96x96.png","caption":"The Saudi Times"},"sameAs":["https:\/\/thesauditimes.net\/en"],"url":"https:\/\/thesauditimes.net\/en\/author\/ttaaamm84\/"}]}},"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/pgnDiS-cwP","jetpack_featured_media_url":"https:\/\/thesauditimes.net\/en\/wp-content\/uploads\/2025\/08\/ACWA-Power-Commences-Commercial-Operation-of-Three-Major-Solar-Plants-with-2.79-GW-Total-Capacity.jpg","_links":{"self":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/48163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/comments?post=48163"}],"version-history":[{"count":2,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/48163\/revisions"}],"predecessor-version":[{"id":60157,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/posts\/48163\/revisions\/60157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/media\/48164"}],"wp:attachment":[{"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/media?parent=48163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/categories?post=48163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thesauditimes.net\/en\/wp-json\/wp\/v2\/tags?post=48163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}